How long does a deck last

A pressure-treated deck lasts 15 to 25 years and composite decking 25 to 30, on a frame that is usually still pine. What ends a deck is almost never the boards you walk on.

Weathered gray decking

National average

$60

per sq ft

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

A pressure-treated pine deck lasts 15 to 25 years. Cedar lasts 15 to 20. Composite decking lasts 25 to 30, on a frame that is usually still pressure-treated pine and therefore still ages at pine's rate.

That last point is the one worth holding onto. What ends a deck is almost never the boards you walk on. It is the frame, the posts and the ledger, which nobody looks at.

What lasts how long

Component or materialTypical life
Pressure-treated pine decking15 to 25 years
Cedar decking15 to 20 years
Redwood decking20 to 30 years
Tropical hardwood, ipe or similar25 to 50 years
Composite decking25 to 30 years
PVC decking30 to 50 years
Pressure-treated frame20 to 30 years
Ledger board, properly flashed25 to 35 years
Ledger board, unflashed10 to 15 years
Posts in ground contact10 to 20 years
Posts on brackets above concrete25 to 40 years
Concrete footings40 years or more
Galvanized fasteners15 to 25 years
Stainless fasteners40 years or more
Wood railing10 to 20 years
Aluminum or composite railing25 to 40 years
Stain finish2 to 5 years
Deck framing from below
The joist tops are where a frame rots first, because boards fitted tight hold water against them. Joist tape during construction adds years for pennies a foot.

The five things that actually decide it

Flashing over the ledger. A deck with proper flashing where it meets the house lasts twice as long as one without, and the difference is a $30 piece of metal installed on day one. Unflashed ledgers rot, and they take the house's rim joist with them.

Whether the posts touch the ground. A post set in soil, or in concrete with no drainage, wicks water and rots at grade. A post on a galvanized bracket above a concrete pier stays dry and outlasts the deck.

Drainage between boards. Boards fitted tight, or with debris packed in the gaps, hold water against the joists. The joist tops are where a frame rots first, and joist tape at $0.50 to $1.50 a linear foot during construction adds years.

The fasteners. Modern pressure-treated lumber is corrosive to ordinary galvanized steel. Hot-dip galvanized or stainless is required; electro-galvanized fails. A deck whose fasteners are corroding is failing at every connection at once.

Finish, or the decision not to. A stained deck lasts longer than a bare one. A deck finished once in 2009 and never again is worse off than one never finished at all, because a failed film traps moisture.

Reading your own deck

Twenty minutes each spring:

  • Screwdriver test the ledger, the rim joist behind it, joist ends, post bases and stair stringers. Soft is rot.
  • Look for the flashing over the ledger. Absence is the most common finding.
  • Shake the railing at the top of the stairs. Movement is a post attachment problem.
  • Bounce on it. A deck that moves has a framing problem.
  • Look at the fasteners for rust, backing out, or hangers fastened with the wrong nails.
  • Check the boards for cupping, splitting, and soft spots around fasteners.

The frame findings are the ones that matter. Boards can be replaced; a rotten ledger is a structural repair and a collapse risk.

Extending it

  • Clean and reseal on cycle: every two to four years for semi-transparent stain
  • Keep debris out of the gaps, especially where a deck sits under trees
  • Keep planters off the boards, or on feet, because a planter sitting flat holds water permanently
  • Clear snow with a plastic shovel, and keep de-icing salt off wood
  • Trim back planting so air moves under and around it
  • Replace corroding fasteners before the connections loosen

A deck maintained this way reaches the top of its range. One left alone reaches the bottom.

Frequently asked questions

Can I put composite decking on an old frame?

Only if the frame is sound and the joist spacing suits it: most composite needs joists at 16 inches on center, some at 12 for diagonal patterns. Adding joists is $100 to $300 each, and putting 30-year decking on a 20-year frame is a decision worth making deliberately.

Does composite decking really last longer?

The boards do, and they do not rot, splinter or need staining. They fade, they scratch, they get very hot in direct sun, and the early generations stained badly. The frame underneath is still wood, which is why a composite deck is not a maintenance-free deck.

How do I know if my deck is safe?

The ledger, the posts and the railing, in that order. If the ledger is unflashed or soft, or the railing moves when you push it, those are the two that fail with people on the deck. An inspection by a contractor is $150 to $400.

When should I replace rather than repair?

When the ledger or the rim joist behind it is rotten, when more than a quarter of the joists are soft, when the posts have failed at grade, or when the deck does not meet current code for railing height and stair geometry and you are opening it up anyway.

Is a permit needed for a rebuild?

For structural work, yes in almost every jurisdiction. The footing and framing inspections are the only independent check anyone will make on the parts that carry people.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$6,000 to $20,000

Typically $12,000 · 200 sq ft · standard · national

Built from this guide's national range of $30 to $100 per sq ft. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for carpenters in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 45% of this job is labor, so a state paying 20% above the national mean lands about 9% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per sq ft cost by state, most expensive first
StateTypicalRangeWage index
Hawaii$69$35 to $1151.33×
Alaska$66$33 to $1101.23×
Illinois$66$33 to $1101.22×
Massachusetts$66$33 to $1101.21×
Washington$66$33 to $1091.21×
Show the other 40 states and the District of Columbia
StateTypicalRangeWage index
California$65$33 to $1091.20×
New York$64$32 to $1071.16×
New Jersey$63$31 to $1041.10×
Oregon$62$31 to $1041.08×
Minnesota$62$31 to $1031.07×
Nevada$61$31 to $1021.05×
Maryland$61$31 to $1021.05×
Connecticut$61$31 to $1021.05×
Colorado$60$30 to $1001.01×
District of Columbia$60$30 to $1001.01×
Wisconsin$60$30 to $1000.99×
Missouri$60$30 to $1000.99×
Indiana$60$30 to $1000.99×
Rhode Island$59$30 to $990.98×
New Hampshire$59$30 to $990.98×
Maine$59$30 to $980.96×
Pennsylvania$59$30 to $980.96×
Delaware$59$29 to $980.95×
Ohio$59$29 to $980.95×
Michigan$59$29 to $980.95×
Vermont$59$29 to $980.94×
Montana$58$29 to $960.91×
Kansas$57$29 to $960.91×
Wyoming$57$29 to $960.90×
Arizona$57$29 to $950.90×
North Dakota$57$28 to $950.88×
Iowa$57$28 to $950.88×
New Mexico$57$28 to $940.88×
Idaho$56$28 to $930.85×
Virginia$56$28 to $930.84×
Utah$56$28 to $930.84×
South Carolina$56$28 to $930.84×
Nebraska$56$28 to $930.84×
Kentucky$56$28 to $930.83×
Tennessee$55$28 to $920.82×
Florida$55$27 to $910.80×
Louisiana$54$27 to $900.79×
Arkansas$54$27 to $900.78×
South Dakota$54$27 to $900.78×
Texas$54$27 to $900.78×
West Virginia$54$27 to $900.77×

Least expensive

StateTypicalRangeWage index
North Carolina$54$27 to $900.77×
Georgia$54$27 to $890.77×
Oklahoma$53$27 to $890.76×
Alabama$53$27 to $890.75×
Mississippi$53$27 to $890.75×

All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for lumber and wood products: lumber

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

218351484202120222023202420252026
WPU081 is 7.6% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU081.

Sources and methodology

Labor
Carpenters (SOC 47-2031) — BLS OEWS, May 2025
Materials
Lumber and wood products: lumber (BLS PPI WPU081, August 2026)
Split
About 45% of this figure is labor and 55% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.