Bathroom tile costs $10 to $40 a square foot installed. Tile is what people compare and labor is where the money is: the same tile in herringbone costs twice what it does in a grid.

Tiled bathroom walls

National average

$20

per sq ft

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Bathroom tile costs $10 to $40 a square foot installed, typically around $20. A small bathroom floor of 40 square feet is therefore $400 to $1,600, and a tiled shower on top of that is $1,500 to $5,000.

Tile is the material people compare and labor is where the money is. The same tile laid in a herringbone pattern costs twice what it does in a straight grid.

What it costs

MaterialInstalled, per square foot
Ceramic$10 to $22
Porcelain$12 to $28
Glass$20 to $45
Natural stone, marble or travertine$20 to $50
Mosaic sheets$18 to $40
Large format porcelain, 24 in and up$18 to $40
Penny round or hexagon mosaic$20 to $45
By areaTypical total
Small bathroom floor, 40 sq ft$400 to $1,600
Shower walls, 60 sq ft$900 to $2,700
Shower floor with mosaic and a slope$400 to $1,200
Full small bathroom, floor and shower$1,800 to $5,500
Tub surround, three walls$800 to $2,500
Removing existing tile$3 to $8 per sq ft
Waterproof membrane system$500 to $1,500
Cement backer board$2 to $5 per sq ft
Underfloor heating mat$10 to $20 per sq ft
Niche built into a shower wall$200 to $600
Schluter or metal trim$3 to $10 per linear foot
A waterproofing layer being applied
Tile is not waterproof and grout is not waterproof. Something behind the tile has to stop water reaching the framing, and that is a membrane.

The waterproofing is not optional and not the tile

This is the part that decides whether the bathroom lasts twenty years or six.

Tile is not waterproof. Grout is not waterproof. Cement backer board is not waterproof; it simply does not disintegrate when wet. Water passes through a tiled shower wall continuously in normal use, and something behind the tile has to stop it reaching the framing.

That something is a membrane: a sheet product bonded to the substrate, or a liquid applied in coats, with the corners, the changes of plane and every screw penetration sealed. In a shower it must connect to a bonded pan so the whole assembly is continuous.

Ask which system the contractor uses by name. A contractor who answers immediately and specifically is the one you want. Tile over green drywall is a failure with a date on it, and it is still being installed.

Where labor cost comes from

Pattern. A straight grid or running bond is the baseline. Herringbone, chevron, basketweave and diagonal all take two to three times as long because every tile meets a cut.

Tile size. Large format tile needs a very flat substrate; anything out by a few millimeters shows as lippage. Leveling a floor for 24 inch tile can cost more than the tile.

Small mosaic. Fast over open field, slow at every edge, corner and drain, where chips are cut individually.

Shower floors. A sloped shower floor to a central or linear drain is skilled work and is priced separately from the walls for good reason.

Natural stone. Sealed before grouting and again after, and unforgiving of an uneven wall.

Choosing tile that suits a bathroom

Floor tile needs slip resistance. Look for a COF rating of 0.42 or above for wet areas. Polished marble on a bathroom floor is beautiful and genuinely slippery.

Shower floors want small tile, because more grout lines mean more grip and small tiles conform to the slope.

Porcelain over ceramic where water is constant. Porcelain absorbs less than 0.5% water; ceramic absorbs more.

Rectified edges allow narrow grout lines and cost more. Non-rectified tile needs wider grout to hide size variation.

Grout. Epoxy grout resists staining and is harder to work with and more expensive. Cement grout with a good sealer is fine for most bathrooms if it is actually sealed.

Frequently asked questions

Can I tile a bathroom myself?

A floor, plausibly, with a weekend and a decent tile cutter. A shower, not unless you are prepared to learn the waterproofing properly, because that is the part that fails and it fails invisibly for two years first.

How long does it take?

A small bathroom floor is one to two days. A full bathroom with a tiled shower is five to ten days, because the membrane, the mortar and the grout each need to cure before the next stage. Rushing that is exactly how it goes wrong.

Can I tile over existing tile?

On a floor, sometimes, and it adds height that affects the door and the toilet flange. In a shower, no. If you are retiling a shower, the reason is usually that the waterproofing failed, and covering it does not address that.

What grout color should I use?

Matching grout makes the wall read as one surface and hides pattern. Contrasting grout makes the pattern the feature and shows every wobble in the setting. Mid-gray is the forgiving default on a floor because it does not show dirt.

Is heated floor worth it?

In a bathroom, more than anywhere else in the house, because you stand on it barefoot. An electric mat under a small bathroom floor is $400 to $800 in materials and the labor is marginal while the floor is already up. It is the upgrade people report being most pleased with.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$2,000 to $8,000

Typically $4,000 · 200 sq ft · standard · national

Built from this guide's national range of $10 to $40 per sq ft. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for tile and stone setters in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 55% of this job is labor, so a state paying 20% above the national mean lands about 11% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per sq ft cost by state, most expensive first
StateTypicalRangeWage index
Hawaii$25$13 to $501.48×
Maine$25$12 to $491.41×
Massachusetts$24$12 to $481.35×
Washington$24$12 to $471.33×
Illinois$22$11 to $451.22×
Show the other 37 states
StateTypicalRangeWage index
New Jersey$22$11 to $451.21×
Nevada$22$11 to $441.18×
Connecticut$22$11 to $441.17×
Minnesota$22$11 to $431.14×
Pennsylvania$22$11 to $431.14×
New York$21$11 to $431.11×
Wisconsin$21$11 to $421.10×
California$21$10 to $421.08×
Iowa$20$10 to $401.01×
Oregon$20$10 to $401.01×
Missouri$20$10 to $401.01×
Nebraska$20$9.78 to $390.96×
Montana$20$9.76 to $390.96×
New Hampshire$19$9.75 to $390.95×
Colorado$19$9.71 to $390.95×
Kansas$19$9.70 to $390.95×
Vermont$19$9.69 to $390.94×
South Dakota$19$9.58 to $380.92×
Arizona$19$9.48 to $380.91×
South Carolina$19$9.46 to $380.90×
Indiana$19$9.38 to $380.89×
Rhode Island$19$9.38 to $380.89×
Utah$19$9.31 to $370.87×
Oklahoma$19$9.29 to $370.87×
West Virginia$19$9.28 to $370.87×
North Dakota$19$9.25 to $370.86×
Virginia$19$9.25 to $370.86×
Michigan$18$9.23 to $370.86×
Texas$18$9.24 to $370.86×
Georgia$18$9.19 to $370.85×
Florida$18$9.19 to $370.85×
Ohio$18$9.09 to $360.83×
Maryland$18$9.08 to $360.83×
Idaho$18$9.06 to $360.83×
Kentucky$18$8.82 to $350.79×
North Carolina$18$8.77 to $350.78×
Louisiana$17$8.61 to $340.75×

Least expensive

StateTypicalRangeWage index
New Mexico$17$8.55 to $340.74×
Tennessee$17$8.55 to $340.74×
Mississippi$17$8.53 to $340.73×
Alabama$17$8.49 to $340.72×
Arkansas$17$8.30 to $330.69×

47 of 50 states; the District of Columbia has no estimate. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for special indexes: construction materials

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

244316388202120222023202420252026
WPUSI012011 is 10.1% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPUSI012011.

Sources and methodology

Labor
Tile and stone setters (SOC 47-2044) — BLS OEWS, May 2025
Materials
Special indexes: construction materials (BLS PPI WPUSI012011, August 2026)
Split
About 55% of this figure is labor and 45% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.