Subpanel installation cost
Installing a subpanel costs $600 to $2,500, typically $1,200. It adds breaker spaces where they are needed, and it does not add capacity, which is the distinction that decides whether it helps.
National average
$1,200
per project
Base pricing reviewed September 2026
Installing a subpanel costs $600 to $2,500, typically around $1,200. A subpanel is a second breaker box fed from the main one, and it exists to put circuits where they are needed without running a dozen long cables back to the house panel.
The two things that move the price are the distance from the main panel and whether that panel has room to feed it.
What it costs
| Job | Typical cost |
|---|---|
| 60 amp subpanel, same room as the main | $600 to $1,200 |
| 100 amp subpanel, elsewhere in the house | $900 to $2,000 |
| 100 amp subpanel in a detached garage or shed | $1,500 to $4,500 |
| 125 to 200 amp subpanel | $1,500 to $3,500 |
| Feeder cable, per linear foot | $8 to $20 |
| Trenching to an outbuilding, per linear foot | $10 to $30 |
| Main panel upgrade first, if needed | $1,500 to $6,000 |
| Grounding electrode at an outbuilding | $200 to $600 |
| Permit and inspection | $75 to $400 |
| Each circuit added afterwards | $150 to $500 |
When a subpanel is the right answer
A detached garage, workshop or shed. One feeder out to a subpanel is far cheaper and tidier than several individual circuits.
A finished basement or attic conversion, where a dozen new circuits would otherwise each need a home run to the main panel.
A main panel that is physically full but has adequate capacity. A subpanel adds breaker spaces without replacing the service.
An addition, for the same reason.
A garage EV charger plus a workshop, where you want local disconnects and room to grow.
When it is not
If the main panel is at its capacity rather than merely out of spaces, a subpanel does not help. A 100 amp service that is already loaded cannot feed a 100 amp subpanel usefully; that is a service upgrade at $1,500 to $6,000.
The distinction matters and it is worth asking directly: is the panel full, or is the service undersized? Those are different problems with different prices, and a subpanel solves only the first.
A load calculation is what answers it, and any electrician quoting a subpanel should have done one.
The four-wire rule
This is the detail that separates a correct subpanel from a common and dangerous mistake.
In a subpanel, the neutral and the ground must be separated. The neutral bar is isolated from the enclosure; the ground bar is bonded to it. They are joined only once in the whole system, at the main panel.
Bonding them again at the subpanel puts normal return current onto the grounding conductors and onto any metal they touch: conduit, pipes, appliance cases. It is invisible, it is common in DIY work, and it is exactly the situation grounding exists to prevent.
So the feeder is four wires: two hots, a neutral and a ground. Three-wire feeders to subpanels were permitted in some older situations and are not now.
If you look in a subpanel and the white wires and the bare wires land on the same bar, that is the fault.
Detached buildings
A subpanel in a detached garage or shed adds requirements:
- Its own grounding electrode, usually a rod or two driven at the building
- A disconnect at the building
- Burial depth for the feeder, 18 to 24 inches depending on the wiring method
- Conductor sizing for voltage drop over the run, which is why a long feeder is a bigger cable than the amperage alone suggests
That last one is a real cost. A 100 amp feeder 150 feet to a workshop is a substantially larger and more expensive cable than the same feeder at 20 feet.
Frequently asked questions
How many circuits can a subpanel hold?
Physically, whatever the box is rated for, commonly 12 to 24 spaces. Electrically, whatever the feeder and the load calculation support. A 60 amp subpanel with 20 spaces is perfectly normal; the spaces are for convenience, not capacity.
Can I install one myself?
In some jurisdictions a homeowner may, with a permit and an inspection. The neutral-ground separation, the correct feeder sizing and the grounding at an outbuilding are the parts most often got wrong, and the inspection exists precisely for that.
Does a subpanel let me add an EV charger?
If the service has the capacity, yes, and it is often the tidy way to do it. If the service does not, no. Ask for the load calculation.
Do I need a permit?
Yes, essentially everywhere. It is a change to the distribution system and the inspection is the only independent check that the neutral and ground were separated.
Can a subpanel be fed from another subpanel?
Physically yes and it is usually a sign the design should be reconsidered. Each stage adds voltage drop and complexity, and it makes the system harder to understand for whoever works on it next.
What this costs in your state
Priced from the mean hourly wage for electricians in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 60% of this job is labor, so a state paying 20% above the national mean lands about 12% above the national price rather than 20%. Materials cost much the same everywhere.
| State | Typical | Range | Wage index |
|---|---|---|---|
| Oregon | $1,485 | $742 to $3,093 | 1.40× |
| Washington | $1,431 | $716 to $2,982 | 1.32× |
| Hawaii | $1,415 | $708 to $2,949 | 1.30× |
| Illinois | $1,409 | $704 to $2,935 | 1.29× |
| Alaska | $1,387 | $693 to $2,889 | 1.26× |
Show the other 40 states and the District of Columbia
| State | Typical | Range | Wage index |
|---|---|---|---|
| District of Columbia | $1,375 | $687 to $2,864 | 1.24× |
| New Jersey | $1,353 | $677 to $2,819 | 1.21× |
| California | $1,345 | $672 to $2,802 | 1.20× |
| New York | $1,335 | $667 to $2,781 | 1.19× |
| Massachusetts | $1,301 | $651 to $2,711 | 1.14× |
| Minnesota | $1,294 | $647 to $2,696 | 1.13× |
| Connecticut | $1,259 | $630 to $2,624 | 1.08× |
| Maine | $1,258 | $629 to $2,621 | 1.08× |
| Pennsylvania | $1,243 | $622 to $2,590 | 1.06× |
| Nevada | $1,243 | $621 to $2,589 | 1.06× |
| Maryland | $1,240 | $620 to $2,583 | 1.06× |
| Wyoming | $1,234 | $617 to $2,571 | 1.05× |
| Rhode Island | $1,227 | $613 to $2,556 | 1.04× |
| Michigan | $1,224 | $612 to $2,549 | 1.03× |
| Wisconsin | $1,223 | $612 to $2,549 | 1.03× |
| Vermont | $1,219 | $609 to $2,539 | 1.03× |
| Missouri | $1,208 | $604 to $2,517 | 1.01× |
| Montana | $1,204 | $602 to $2,509 | 1.01× |
| Indiana | $1,193 | $597 to $2,486 | 0.99× |
| Delaware | $1,193 | $596 to $2,485 | 0.99× |
| North Dakota | $1,190 | $595 to $2,478 | 0.98× |
| Kansas | $1,177 | $588 to $2,452 | 0.97× |
| Ohio | $1,173 | $587 to $2,444 | 0.96× |
| Virginia | $1,163 | $582 to $2,424 | 0.95× |
| West Virginia | $1,163 | $582 to $2,423 | 0.95× |
| Idaho | $1,151 | $575 to $2,397 | 0.93× |
| Colorado | $1,148 | $574 to $2,391 | 0.93× |
| New Hampshire | $1,143 | $571 to $2,380 | 0.92× |
| Utah | $1,138 | $569 to $2,370 | 0.91× |
| Arizona | $1,127 | $563 to $2,348 | 0.90× |
| Nebraska | $1,124 | $562 to $2,342 | 0.90× |
| Tennessee | $1,120 | $560 to $2,333 | 0.89× |
| Oklahoma | $1,119 | $559 to $2,331 | 0.89× |
| Iowa | $1,116 | $558 to $2,326 | 0.88× |
| Louisiana | $1,108 | $554 to $2,308 | 0.87× |
| South Dakota | $1,104 | $552 to $2,301 | 0.87× |
| Kentucky | $1,098 | $549 to $2,288 | 0.86× |
| Georgia | $1,095 | $548 to $2,282 | 0.85× |
| New Mexico | $1,080 | $540 to $2,251 | 0.83× |
| Texas | $1,077 | $539 to $2,244 | 0.83× |
| South Carolina | $1,075 | $537 to $2,239 | 0.83× |
Least expensive
| State | Typical | Range | Wage index |
|---|---|---|---|
| Mississippi | $1,064 | $532 to $2,217 | 0.81× |
| Florida | $1,061 | $530 to $2,210 | 0.81× |
| Alabama | $1,059 | $530 to $2,207 | 0.80× |
| North Carolina | $1,053 | $526 to $2,193 | 0.80× |
| Arkansas | $1,019 | $509 to $2,122 | 0.75× |
All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.
Producer price index for machinery and equipment: electrical machinery and equipment
This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.
Sources and methodology
- Labor
- Electricians
- Split
- About 60% of this figure is labor and 40% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.
Read next
Electrical panel upgrade cost$1,500 to $6,000per projectUpgrading from 100 to 200 amps costs $1,500 to $6,000, typically $2,800. Replacing a panel at the same amperage is cheaper, and knowing which job you need is most of the decision.
EV charger installation cost$500 to $2,500per projectA Level 2 home charger costs $500 to $2,500 installed. The federal credit expired for installations after 30 June 2026, and hardwiring is now often cheaper than fitting an outlet.
Hot tub electrical hookup cost$700 to $2,500per projectWiring a hot tub costs $700 to $2,500, typically $1,300. The requirements are strict and inspected, because it is a large amount of water sitting on top of a 240 volt appliance.
Electrical inspection cost$200 to $600eachAn electrical inspection costs $200 to $600, typically $350. It is the cheapest way to find out whether the wiring in a house is a maintenance item or a five-figure project.
Electrician cost by state$80 to $180per hourAn electrician bills $85 an hour in Arkansas and $140 in Illinois. A 65% spread on the same hour of the same work, and it is almost entirely wages.