How long does plumbing last

Copper lasts 50 to 70 years, PEX 40 to 50, cast iron drain 50 to 100. Plumbing is the system that fails quietly for years and then all at once, and the material in your walls says roughly where you are.

An aged pressure valve and gauges

National average

$7,500

per project

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Copper supply pipe lasts 50 to 70 years. PEX lasts 40 to 50. Cast iron drain pipe lasts 50 to 100. Galvanized steel lasts 40 to 50 and most of what is still installed is past that.

Those numbers matter because plumbing is the system in a house that fails quietly for years and then all at once, and the material in your walls tells you roughly where you are.

What lasts how long

Material or componentTypical life
Copper supply pipe50 to 70 years
PEX supply pipe40 to 50 years
CPVC supply pipe40 to 50 years
Galvanized steel supply40 to 50 years
Polybutylene supply10 to 25 years, replace on sight
Cast iron drain pipe50 to 100 years
PVC and ABS drain pipe50 years or more
Clay sewer lateral50 to 60 years
Orangeburg sewer pipe30 to 50 years, replace on sight
Water heater, tank8 to 12 years
Water heater, tankless15 to 25 years
Water heater, heat pump10 to 15 years
Toilet, porcelainindefinite
Toilet internals5 to 10 years
Faucet cartridge10 to 20 years
Shut-off valve15 to 25 years
Sump pump7 to 10 years
Well pump, submersible8 to 15 years
Pressure tank10 to 20 years
Garbage disposal8 to 15 years
Washing machine hose, rubber3 to 5 years
Washing machine hose, braided steel8 to 10 years

The two materials to replace regardless of age

Polybutylene. Gray plastic supply pipe with crimped bands, installed roughly 1978 to 1995. It fails at fittings and along its length, it was the subject of one of the largest class actions in American construction, and insurers increasingly refuse to cover houses that still have it. If you have it, you are budgeting a repipe.

Orangeburg. Bituminous fiber sewer pipe, essentially tar paper rolled into a tube, used from the 1940s to the 1970s. It does not crack, it deforms into an oval and then collapses. A camera inspection identifies it in seconds.

Lead supply lines, from before the 1986 federal ban, belong on this list for a different reason. Many utilities now fund replacement; ask before you pay.

What decides where in the range you land

Water chemistry. Aggressive water, low pH or high chlorides, eats copper from the inside. Two identical copper systems in different towns can differ by twenty years.

Water pressure. Anything above 80 psi stresses every joint continuously. A $15 gauge on an outside faucet tells you, and a pressure reducing valve is $350 to $800. It is the cheapest life extension available to a plumbing system.

Water temperature. Hot lines fail before cold ones, consistently. A house with a water heater set to 140°F wears its hot side faster than one set to 120°F.

Hardness. Scale narrows pipe and shortens water heater life sharply. Above about 10 grains per gallon it is worth softening on equipment grounds alone.

Installation. Copper with a burr left inside a fitting erodes at that point for thirty years and then leaks there.

The signs the system rather than a fixture is failing

One leak is a leak. These say the system:

  • Two or three failures in different places within two years
  • Water that runs rusty first thing in the morning from every faucet
  • Pressure that has fallen gradually everywhere over years
  • A plumber showing you green or white crust at multiple joints
  • Visible pinholes on more than one run

At that point the question stops being what the repair costs and becomes what a repipe costs: $4,500 to $12,000 in PEX, $8,000 to $22,000 in copper.

A water pressure gauge
Anything above 80 psi stresses every joint in the house continuously. A $15 gauge on an outside faucet tells you in ten seconds.

The maintenance that actually extends it

Short list, all cheap, in order of value:

  1. Check the pressure. $15 gauge, ten seconds, and above 80 psi fix it.
  2. Replace rubber washing machine hoses with braided steel. Twenty dollars. Failed hoses are among the most common household floods there is.
  3. Flush the water heater annually where water is hard. Sediment on the bottom insulates the burner from the water and cooks the tank.
  4. Exercise the shut-off valves once a year. A valve that has not moved in twenty years will not move when you need it.
  5. Fix running toilets immediately. On a well or a septic system they cost more than water.
  6. Insulate pipes in crawl spaces, attics and garages before the first freeze.

Frequently asked questions

How do I tell what my pipes are made of?

Look under a sink or at the water heater. Copper is copper colored and rigid. Galvanized steel is dull gray, threaded, and a magnet sticks to it. PEX is flexible plastic, usually red, blue or white. CPVC is rigid cream plastic. Polybutylene is gray plastic with metal or plastic crimp bands, and it is the one to identify with certainty.

Should I repipe preemptively?

Only if the material is polybutylene, or the house is being gutted anyway and the walls are open. Otherwise repipe on evidence: repeated failures, not age alone. Plenty of 70 year old copper is fine.

Does a whole-house filter extend pipe life?

A sediment filter helps in water carrying grit. It does nothing for pH or chlorides, which is what actually attacks copper. If corrosion is the concern, test the water before buying equipment.

Is PEX as good as copper?

It resists freezing better, costs far less to install, and has no corrosion problem. It is damaged by UV, by rodents in a few documented cases, and its long-term record is 30 years rather than 70 because that is how long it has existed. For a repipe today it is the default choice for good reasons.

My house is 60 years old with original copper and no problems.

Then you have good water and a careful original installer, which is exactly the population that reaches 70. Check the pressure, replace the washer hoses, and repipe on evidence rather than on a birthday.

What this costs in your state

Priced from the mean hourly wage for plumbers, pipefitters and steamfitters in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 50% of this job is labor, so a state paying 20% above the national mean lands about 10% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per project cost by state, most expensive first
StateTypicalRangeWage index
Oregon$8,865$5,319 to $14,1841.36×
Illinois$8,603$5,162 to $13,7651.29×
New Jersey$8,560$5,136 to $13,6961.28×
District of Columbia$8,489$5,093 to $13,5821.26×
Alaska$8,450$5,070 to $13,5201.25×
Show the other 41 states
StateTypicalRangeWage index
Massachusetts$8,447$5,068 to $13,5151.25×
Washington$8,363$5,018 to $13,3821.23×
Minnesota$8,254$4,953 to $13,2071.20×
Wisconsin$8,152$4,891 to $13,0431.17×
New York$8,104$4,862 to $12,9671.16×
Hawaii$8,052$4,831 to $12,8841.15×
California$8,027$4,816 to $12,8441.14×
Rhode Island$7,990$4,794 to $12,7831.13×
Montana$7,812$4,687 to $12,5001.08×
Michigan$7,764$4,658 to $12,4221.07×
Pennsylvania$7,754$4,652 to $12,4061.07×
Indiana$7,680$4,608 to $12,2891.05×
Connecticut$7,668$4,601 to $12,2681.04×
Missouri$7,647$4,588 to $12,2351.04×
Maryland$7,569$4,542 to $12,1111.02×
Nevada$7,465$4,479 to $11,9450.99×
Kansas$7,460$4,476 to $11,9360.99×
Iowa$7,389$4,433 to $11,8220.97×
Ohio$7,371$4,423 to $11,7940.97×
Colorado$7,340$4,404 to $11,7440.96×
Vermont$7,334$4,400 to $11,7340.96×
Kentucky$7,328$4,397 to $11,7250.95×
Delaware$7,289$4,374 to $11,6630.94×
Arizona$7,280$4,368 to $11,6470.94×
Maine$7,208$4,325 to $11,5330.92×
New Hampshire$7,191$4,315 to $11,5050.92×
North Dakota$7,188$4,313 to $11,5000.92×
Nebraska$7,164$4,298 to $11,4620.91×
Utah$7,086$4,252 to $11,3380.89×
Louisiana$7,004$4,202 to $11,2060.87×
Wyoming$6,966$4,180 to $11,1460.86×
New Mexico$6,961$4,176 to $11,1370.86×
Texas$6,908$4,145 to $11,0520.84×
Virginia$6,901$4,141 to $11,0420.84×
Tennessee$6,894$4,136 to $11,0300.84×
Oklahoma$6,814$4,088 to $10,9020.82×
West Virginia$6,804$4,082 to $10,8860.81×
Idaho$6,787$4,072 to $10,8590.81×
Georgia$6,775$4,065 to $10,8400.81×
Alabama$6,751$4,051 to $10,8020.80×
North Carolina$6,697$4,018 to $10,7150.79×

Least expensive

StateTypicalRangeWage index
Mississippi$6,695$4,017 to $10,7120.79×
Florida$6,661$3,997 to $10,6580.78×
South Carolina$6,654$3,992 to $10,6460.77×
South Dakota$6,635$3,981 to $10,6170.77×
Arkansas$6,381$3,829 to $10,2100.70×

All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for copper wire and cable

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

204319433202120222023202420252026
WPU1025 is 23.3% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU1025.

Sources and methodology

Labor
Plumbers, pipefitters and steamfitters (SOC 47-2152) — BLS OEWS, May 2025
Materials
Copper wire and cable (BLS PPI WPU1025, August 2026)
Split
About 50% of this figure is labor and 50% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.