Repairing a burst pipe costs $150 to $1,200, typically $600. What turns that into a $5,000 bill is not the plumbing. It is the drywall, the flooring and the drying.

Water escaping from a leaking pipe

National average

$600

per project

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Repairing a burst pipe costs $150 to $1,200 for the pipe itself, typically around $600. What turns that into a $5,000 bill is not the plumbing. It is the drywall, the flooring and the drying.

The repair is often an hour of work. The water damage is the project.

What the repair costs

SituationTypical cost
Accessible pipe, basement or crawl space$150 to $600
Inside a wall, one section of drywall opened$400 to $1,200
Under a concrete slab$1,500 to $6,000
Beneath a finished floor$800 to $3,000
Main water line outside the house$1,500 to $6,000
Emergency call-out premiumadd $150 to $400
Drywall repair and paint, per opening$150 to $500
Water damage drying and dehumidification$500 to $4,000
Flooring replacement, per room$800 to $5,000

The last three rows are why two burst pipes with identical plumbing bills can differ by $6,000.

A water stain spreading across a ceiling
Water in a wall cavity starts growing mold in 24 to 48 hours. That deadline is what turns a repair into a remediation.

The first ten minutes decide the cost

Shut the water off at the main. Then open the lowest faucet in the house, which drains the pressure still sitting in the pipes and stops the leak feeding itself.

Then, in order: photograph everything before you move it, get standing water out, move furniture and anything absorbent off wet flooring, and get air moving.

Water in a wall cavity begins growing mold in 24 to 48 hours. That is the deadline that turns a repair into a remediation, and it is why a drying company on the same day is cheaper than a cheaper one on Thursday.

Why pipes burst

Freezing is the common one, and it does not burst the pipe where the ice is. Ice expands and pushes water along the pipe toward a closed faucet; the pressure builds between the ice and the faucet, and the pipe fails at the weakest point in that stretch. That is why the split is often several feet from the frozen section.

Pressure. Municipal supply above about 80 psi stresses every joint in the house. A $15 gauge on an outside faucet tells you in ten seconds. Above 80, a pressure reducing valve costs $350 to $800 and pays for itself.

Corrosion. Galvanized steel from before about 1960 corrodes from the inside and fails without warning. Copper in aggressive water develops pinholes.

Age and material. Polybutylene, installed widely between 1978 and 1995, fails in ways that made it the subject of a class action. If you have gray plastic supply pipe with crimped fittings, that is what it is, and it is a repipe conversation.

Repair or repipe

One burst in a copper system that is otherwise sound is a repair.

Repipe when:

  • The pipe is galvanized steel or polybutylene
  • This is the second or third failure in two years
  • The plumber shows you pinholes elsewhere on the same run
  • The house is being renovated anyway and the walls are open

A PEX repipe costs $4,500 to $12,000 and copper $8,000 to $22,000. Against $600 a time plus drywall, three failures makes the maths obvious.

Preventing the freezing one

  • Disconnect and drain outside hose bibs before the first freeze, every year
  • Insulate pipes in crawl spaces, attics, garages and against exterior walls
  • Below freezing, open cabinet doors under sinks on exterior walls so house heat reaches the pipes
  • In a hard freeze, let one faucet furthest from the main run a pencil-thin stream
  • Leaving for the winter: shut the main, drain the system, and leave the heating at 55°F rather than off

Frequently asked questions

Will insurance pay for it?

Sudden and accidental water damage is normally covered. The pipe itself usually is not, and gradual leaks are typically excluded. Frozen pipes are covered in most policies if you maintained heat in the house, which is why the 55°F rule matters.

How do I know there is a leak inside a wall?

A water meter test settles it: turn off every fixture, note the meter, wait two hours without using water, and read it again. Any movement is a leak. Other signs are a warm patch on a floor, a stain that returns after painting, and a bill that jumped without explanation.

Can I patch it with a repair clamp myself?

A clamp is a legitimate temporary measure on a straight section of copper or steel, and it will hold for days rather than years. It is not a repair, and an insurer who sees one may treat what follows as neglect.

Why did it burst several feet from where the pipe froze?

Because the ice pushes water toward a closed faucet and the pressure builds ahead of it. The pipe fails wherever that stretch is weakest, not where it is coldest.

Should I turn the water back on myself once it is fixed?

Slowly, watching the repair. A fast-opening main valve sends a surge through the system that finds the next weak joint.

What this costs in your state

Priced from the mean hourly wage for plumbers, pipefitters and steamfitters in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 80% of this job is labor, so a state paying 20% above the national mean lands about 16% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per project cost by state, most expensive first
StateTypicalRangeWage index
Oregon$775$194 to $5,1651.36×
Illinois$741$185 to $4,9421.29×
New Jersey$736$184 to $4,9051.28×
District of Columbia$727$182 to $4,8441.26×
Alaska$722$180 to $4,8111.25×
Show the other 41 states
StateTypicalRangeWage index
Massachusetts$721$180 to $4,8081.25×
Washington$711$178 to $4,7371.23×
Minnesota$697$174 to $4,6441.20×
Wisconsin$683$171 to $4,5561.17×
New York$677$169 to $4,5161.16×
Hawaii$671$168 to $4,4711.15×
California$668$167 to $4,4501.14×
Rhode Island$663$166 to $4,4181.13×
Montana$640$160 to $4,2671.08×
Michigan$634$158 to $4,2251.07×
Pennsylvania$633$158 to $4,2171.07×
Indiana$623$156 to $4,1541.05×
Connecticut$621$155 to $4,1431.04×
Missouri$619$155 to $4,1251.04×
Maryland$609$152 to $4,0591.02×
Nevada$596$149 to $3,9700.99×
Kansas$595$149 to $3,9660.99×
Iowa$586$146 to $3,9050.97×
Ohio$584$146 to $3,8900.97×
Colorado$580$145 to $3,8640.96×
Vermont$579$145 to $3,8580.96×
Kentucky$578$145 to $3,8530.95×
Delaware$573$143 to $3,8200.94×
Arizona$572$143 to $3,8120.94×
Maine$563$141 to $3,7510.92×
New Hampshire$560$140 to $3,7360.92×
North Dakota$560$140 to $3,7330.92×
Nebraska$557$139 to $3,7130.91×
Utah$547$137 to $3,6470.89×
Louisiana$537$134 to $3,5770.87×
Wyoming$532$133 to $3,5440.86×
New Mexico$531$133 to $3,5400.86×
Texas$524$131 to $3,4950.84×
Virginia$523$131 to $3,4890.84×
Tennessee$522$131 to $3,4830.84×
Oklahoma$512$128 to $3,4140.82×
West Virginia$511$128 to $3,4060.81×
Idaho$509$127 to $3,3910.81×
Georgia$507$127 to $3,3810.81×
Alabama$504$126 to $3,3610.80×
North Carolina$497$124 to $3,3150.79×

Least expensive

StateTypicalRangeWage index
Mississippi$497$124 to $3,3130.79×
Florida$493$123 to $3,2840.78×
South Carolina$492$123 to $3,2780.77×
South Dakota$489$122 to $3,2620.77×
Arkansas$457$114 to $3,0460.70×

All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for plumbing fixtures and brass fittings

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

280335391202120222023202420252026
WPU105 is 5.1% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU105.

Sources and methodology

Labor
Plumbers, pipefitters and steamfitters (SOC 47-2152) — BLS OEWS, May 2025
Materials
Plumbing fixtures and brass fittings (BLS PPI WPU105, August 2026)
Split
About 80% of this figure is labor and 20% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.
Also