Running a gas line costs $15 to $40 a linear foot, with most household jobs between $300 and $1,200. The most common reason people need one is a tankless water heater, which draws four times what a tank does.

A yellow gas pipe against a wall

National average

$25

per linear ft

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Running a gas line costs $15 to $40 a linear foot, typically around $25, with most household jobs landing between $300 and $1,200. A short run from an existing line to a new range is at the bottom. A new line to a fire pit at the end of the yard, with a permit and a pressure test, is at the top.

This is one of the few plumbing jobs where doing it yourself is a genuinely bad idea regardless of how handy you are.

What it costs

JobTypical cost
Per linear foot, installed$15 to $40
Gas line to a kitchen range$250 to $800
Gas line to a dryer$250 to $700
Gas line to a new water heater$300 to $900
Gas line to an outdoor grill or fire pit$400 to $1,500
Gas line to a pool heater$600 to $2,500
Upsizing the line for a tankless water heater$500 to $2,000
New meter or utility service upgrade$500 to $3,000
Permit and inspection$75 to $400
Pressure testusually included, ask
Capping an unused line$100 to $300
Adding a sediment trap and shut-off$50 to $200
A gas meter on an exterior wall
A tankless water heater draws four times what a tank does. The existing half-inch line cannot deliver it, and sometimes the meter cannot either.

Why the tankless line is its own row

The most common reason a household needs new gas pipe is a tankless water heater.

A tank heater draws perhaps 40,000 BTU an hour. A whole-house tankless draws 150,000 to 199,000. The existing 1/2 inch line that fed the tank cannot deliver that, and neither can a meter sized for the old load.

So the quote for a tankless conversion often contains a $500 to $2,000 gas line and sometimes a utility meter upgrade on top. That is not a contractor padding the estimate; it is physics, and it is the single most common surprise in tankless pricing.

Sizing, and why it is not just about the appliance

Gas pipe is sized for the total demand of everything downstream of it and the distance the gas has to travel. Adding one appliance to a line that already runs a furnace, a water heater and a range can undersize the whole branch, and the symptom is not a failure. It is a burner that yellows, a furnace that short cycles, and a water heater that cannot keep up when the range is on.

A proper installer does a load calculation. Ask to see it if the job is anything more than a short run to a single appliance.

What a legitimate installation includes

  • A permit, and an inspection
  • The correct material for the location: black iron indoors, coated steel or approved polyethylene underground, and CSST only where it is permitted and bonded
  • A shut-off valve at the appliance, within reach
  • A sediment trap at each appliance
  • A pressure test held for the required period, witnessed by the inspector
  • Bonding, where CSST is used, which is a lightning safety requirement and gets missed

The permit is not optional paperwork here. An unpermitted gas line is a problem when you sell the house and a much bigger one if there is ever a fire and an insurer looks at how it was installed.

Frequently asked questions

Can I run gas pipe myself?

In most jurisdictions a homeowner may do work on their own residence, and in most jurisdictions it still needs a permit and an inspection. Whether you should is a different question. A water leak is a mess; a gas leak is an explosion, and the failure mode is not one you get to learn from.

How do I know if I smell gas?

Leave the house first. Do not touch light switches, do not use a phone inside, do not open the garage door with the opener. Ring the gas utility from outside; they attend free and usually fast. Only after they clear it is it a plumber's job.

Is flexible CSST as good as black iron?

It is approved, it installs faster, and it costs less in labor. It must be bonded to the electrical grounding system, because it is thin-walled and lightning has caused failures where bonding was skipped. Ask specifically whether the bonding was done and whether the inspector checked it.

Can I convert an appliance from propane to natural gas?

Most ranges, furnaces and water heaters take a conversion kit for $50 to $200 plus labor, because the orifices and the regulator differ. Some cannot be converted at all. Check the model before you assume.

Do I need a permit for a grill line?

Almost always yes, and it is the one people skip most. It is also the one running under a patio where nobody will ever see it again, which is exactly why the inspection exists.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$750 to $2,000

Typically $1,250 · 50 linear ft · standard · national

Built from this guide's national range of $15 to $40 per linear ft. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for plumbers, pipefitters and steamfitters in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 70% of this job is labor, so a state paying 20% above the national mean lands about 14% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per linear ft cost by state, most expensive first
StateTypicalRangeWage index
Oregon$31$19 to $501.36×
Illinois$30$18 to $481.29×
New Jersey$30$18 to $481.28×
District of Columbia$30$18 to $471.26×
Alaska$29$18 to $471.25×
Show the other 41 states
StateTypicalRangeWage index
Massachusetts$29$18 to $471.25×
Washington$29$17 to $461.23×
Minnesota$29$17 to $461.20×
Wisconsin$28$17 to $451.17×
New York$28$17 to $451.16×
Hawaii$28$17 to $441.15×
California$27$16 to $441.14×
Rhode Island$27$16 to $441.13×
Montana$26$16 to $421.08×
Michigan$26$16 to $421.07×
Pennsylvania$26$16 to $421.07×
Indiana$26$16 to $411.05×
Connecticut$26$15 to $411.04×
Missouri$26$15 to $411.04×
Maryland$25$15 to $411.02×
Nevada$25$15 to $400.99×
Kansas$25$15 to $400.99×
Iowa$24$15 to $390.97×
Ohio$24$15 to $390.97×
Colorado$24$15 to $390.96×
Vermont$24$15 to $390.96×
Kentucky$24$15 to $390.95×
Delaware$24$14 to $380.94×
Arizona$24$14 to $380.94×
Maine$24$14 to $380.92×
New Hampshire$24$14 to $380.92×
North Dakota$24$14 to $380.92×
Nebraska$23$14 to $370.91×
Utah$23$14 to $370.89×
Louisiana$23$14 to $360.87×
Wyoming$23$14 to $360.86×
New Mexico$22$13 to $360.86×
Texas$22$13 to $360.84×
Virginia$22$13 to $360.84×
Tennessee$22$13 to $350.84×
Oklahoma$22$13 to $350.82×
West Virginia$22$13 to $350.81×
Idaho$22$13 to $350.81×
Georgia$22$13 to $350.81×
Alabama$22$13 to $340.80×
North Carolina$21$13 to $340.79×

Least expensive

StateTypicalRangeWage index
Mississippi$21$13 to $340.79×
Florida$21$13 to $340.78×
South Carolina$21$13 to $340.77×
South Dakota$21$13 to $340.77×
Arkansas$20$12 to $320.70×

All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for metals and metal products: steel mill products

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

184329474202120222023202420252026
WPU1017 is 23.4% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU1017.

Sources and methodology

Labor
Plumbers, pipefitters and steamfitters (SOC 47-2152) — BLS OEWS, May 2025
Materials
Metals and metal products: steel mill products (BLS PPI WPU1017, August 2026)
Split
About 70% of this figure is labor and 30% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.
Also