Repairing a driveway costs $300 to $3,000, typically $900. What decides which repair you are doing is not the surface. It is whether the base underneath is still there.

A house with a long driveway

National average

$900

per project

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Repairing a driveway costs $300 to $3,000, typically around $900. Filling cracks is $2 to $6 a linear foot. Patching a pothole is $100 to $400. Replacing a failed section is $8 to $20 a square foot, and replacing the whole thing is $4,000 to $10,000.

What decides which of those you are doing is not the surface. It is whether the base underneath is still there.

What it costs

JobTypical cost
Crack filling, asphalt$2 to $6 per linear foot
Crack repair, concrete$4 to $12 per linear foot
Pothole patch$100 to $400 each
Sealcoating asphalt$0.15 to $0.35 per sq ft
Resurfacing asphalt, 1.5 to 2 in overlay$3 to $7 per sq ft
Concrete resurfacing overlay$3 to $10 per sq ft
Replacing a failed section$8 to $20 per sq ft
Mudjacking a settled concrete slab$500 to $1,800
Polyurethane foam lifting$800 to $2,500
Grinding a trip hazard$100 to $400
Full asphalt replacement, 600 sq ft$4,200 to $7,800
Full concrete replacement, 600 sq ft$4,800 to $9,000
Adding a drain to fix the cause$500 to $2,500

Reading the damage

Hairline cracks in concrete. Normal. Concrete cracks; that is why control joints exist. Seal them to keep water out and move on.

Cracks wider than a quarter inch, or with one side higher than the other. The slab has moved, which means the base has. Filling it treats the symptom.

Alligator cracking in asphalt, an interconnected pattern like crocodile skin. The base has failed and the surface is flexing over nothing. This area cannot be sealed or patched; it needs removing and rebuilding.

Potholes. Water got in, froze, and took material with it. A patch is legitimate and it will need doing again if the water still gets in.

A settled slab or a low area holding water. Concrete can be lifted back into place by mudjacking or foam injection for a fraction of replacement, and it is a genuinely good repair when the void beneath is the whole problem.

Spalling, where the concrete surface flakes off. Usually de-icing salt on concrete that was not air-entrained or was finished badly. Resurfacing is the answer; sealing prevents it recurring.

Edges crumbling. Asphalt has no support at the edge. Adding gravel shoulders or an edge restraint stops it.

Water pooling on a surface
Almost every driveway failure is water: in the base, freezing, or washing it out from underneath. A $500 drain often does more than $2,000 of patching.

Fix the water first

Almost every driveway failure is water. Water in the base, freezing, or washing the base out from underneath.

Before spending anything on the surface, look at where the water goes:

  • Does the driveway drain, or does it hold puddles?
  • Does a downspout discharge onto it?
  • Does the ground alongside slope toward it?
  • At the garage, does water run in or away?

A $500 channel drain or a regraded shoulder frequently does more for a driveway than $2,000 of patching, and without it the patching is on a schedule.

Repair or replace

Repair when the damage is localized, the base is sound, and the surface is under about two-thirds of its life.

Resurface when the surface is worn or widely cracked but the base is intact and the levels are right. An asphalt overlay is $3 to $7 a square foot against $7 to $13 for new, and it buys ten to fifteen years.

Replace when:

  • The base has failed over a large area, shown by alligator cracking or widespread settlement
  • The drive has already been overlaid once and is failing again
  • Levels are wrong and water runs toward the house or the garage
  • More than about a third of the area needs work
  • The drive is 25 years old in asphalt or 40 in concrete and repairs are annual

Frequently asked questions

Can I fill cracks myself?

Yes, and it is worth doing. Asphalt crack filler in a bottle or a hot-pour rope, and concrete crack sealant, both cost $15 to $40 and both work if the crack is cleaned out first. Do it in spring or fall, not in high summer when the crack is at its narrowest.

Is sealcoating a repair?

No. It is a surface treatment that slows oxidation on asphalt. It does not fix cracks, it does not restore a failed base, and applied over an unfilled crack it achieves nothing.

What is mudjacking?

Drilling small holes in a settled concrete slab and pumping a slurry or expanding foam underneath to lift it back to level. $500 to $2,500 against several thousand to replace, and it works well where the slab is intact and the ground beneath has washed out.

Why does the same pothole keep coming back?

Because the water that made it is still getting in. Patching without fixing drainage or the base is a recurring cost rather than a repair.

How long should a repair last?

A crack fill, two to five years. A pothole patch, three to eight. An overlay, ten to fifteen. If a repair fails in one season, the diagnosis was wrong rather than the material.

What this costs in your state

Priced from the mean hourly wage for paving, surfacing and tamping equipment operators in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 65% of this job is labor, so a state paying 20% above the national mean lands about 13% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per project cost by state, most expensive first
StateTypicalRangeWage index
Hawaii$1,276$425 to $4,2531.64×
California$1,251$417 to $4,1711.60×
Washington$1,215$405 to $4,0501.54×
Alaska$1,143$381 to $3,8101.42×
District of Columbia$1,111$370 to $3,7051.36×
Show the other 40 states
StateTypicalRangeWage index
Connecticut$1,080$360 to $3,6011.31×
Illinois$1,080$360 to $3,6011.31×
Idaho$1,069$356 to $3,5641.29×
New York$1,032$344 to $3,4411.23×
Minnesota$1,027$342 to $3,4241.22×
Missouri$1,011$337 to $3,3701.19×
Oregon$1,008$336 to $3,3611.19×
Wisconsin$995$332 to $3,3161.16×
Rhode Island$981$327 to $3,2691.14×
Massachusetts$956$319 to $3,1861.09×
New Hampshire$954$318 to $3,1791.09×
Maryland$953$318 to $3,1771.09×
Ohio$940$313 to $3,1321.07×
South Dakota$924$308 to $3,0781.04×
Maine$921$307 to $3,0691.03×
Iowa$911$304 to $3,0371.02×
Arizona$907$302 to $3,0251.01×
Wyoming$901$300 to $3,0041.00×
Montana$893$298 to $2,9770.99×
Indiana$887$296 to $2,9560.98×
Nevada$882$294 to $2,9400.97×
Colorado$881$294 to $2,9380.97×
Vermont$878$293 to $2,9280.96×
Pennsylvania$874$291 to $2,9130.95×
New Jersey$871$290 to $2,9020.95×
West Virginia$862$287 to $2,8730.94×
Michigan$859$286 to $2,8630.93×
Utah$858$286 to $2,8600.93×
Kansas$854$285 to $2,8480.92×
Louisiana$842$281 to $2,8060.90×
Delaware$826$275 to $2,7550.87×
Nebraska$809$270 to $2,6960.84×
Virginia$807$269 to $2,6900.84×
North Carolina$803$268 to $2,6770.83×
Texas$800$267 to $2,6670.83×
Florida$796$265 to $2,6540.82×
Oklahoma$791$264 to $2,6380.81×
Kentucky$789$263 to $2,6300.81×
New Mexico$788$263 to $2,6260.81×
Georgia$786$262 to $2,6210.81×

Least expensive

StateTypicalRangeWage index
South Carolina$784$261 to $2,6140.80×
Tennessee$769$256 to $2,5650.78×
Arkansas$752$251 to $2,5060.75×
Alabama$745$248 to $2,4830.73×
Mississippi$719$240 to $2,3970.69×

49 of 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for special indexes: construction materials

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

244316388202120222023202420252026
WPUSI012011 is 10.1% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPUSI012011.

Sources and methodology

Labor
Paving, surfacing and tamping equipment operators (SOC 47-2071) — BLS OEWS, May 2025
Materials
Special indexes: construction materials (BLS PPI WPUSI012011, August 2026)
Split
About 65% of this figure is labor and 35% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.