Asphalt driveway cost

An asphalt driveway costs $7 to $13 a square foot installed. Concrete costs a little more and lasts longer; asphalt is cheaper up front and needs sealing. The choice depends more on climate than preference.

An asphalt driveway

National average

$10

per sq ft

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

An asphalt driveway costs $7 to $13 a square foot installed, typically around $10. A typical two-car driveway of 600 square feet is therefore $4,200 to $7,800. Concrete costs $8 to $15 for the same area and lasts longer; asphalt is cheaper up front and needs sealing.

The comparison between them is genuinely close and it depends more on climate than on preference.

What it costs

JobTypical cost
New asphalt driveway, per square foot$7 to $13
Two-car driveway, 600 sq ft$4,200 to $7,800
Long rural driveway, per square foot$5 to $10
Resurfacing over sound existing asphalt$3 to $7 per sq ft
Removing an existing driveway$2 to $5 per sq ft
Gravel base, per square foot$1 to $3
Extra base depth for heavy vehicles$1 to $3 per sq ft
Sealcoating$0.15 to $0.35 per sq ft
Crack filling$2 to $6 per linear foot
Pothole repair$100 to $400 each
Apron at the street, concrete$500 to $2,000
Drainage or a channel drain$500 to $2,500
Permit, where required$50 to $500

Asphalt or concrete

AsphaltConcrete
Installed cost, per sq ft$7 to $13$8 to $15
Life15 to 25 years30 to 40 years
MaintenanceSeal every 3 to 5 yearsSeal every 5 years, optional
Cost of maintenance over 20 years$1,200 to $3,000$500 to $1,500
Cold climatesBetter, flexes with frostCracks and spalls with salt
Hot climatesSoftens, can rutBetter
RepairsEasy and nearly invisibleDifficult and visible
Usable after installation2 to 3 days7 days, 28 for vehicles
Appearance optionsBlackColors, stamping, exposed aggregate

In the northern half of the country, asphalt's flexibility genuinely suits freeze-thaw cycles and it does not spall from de-icing salt. In the south, concrete stays cooler, does not soften, and lasts longer.

That is most of the decision, and it is why driveways look different by region.

The base, and why cheap driveways fail

An asphalt driveway is a flexible pavement: it moves with the ground and relies on the base to spread the load.

6 to 8 inches of compacted aggregate base for a residential driveway, more in poorly draining soil or where trucks will park.

2 to 3 inches of asphalt in one or two lifts, compacted while hot.

Drainage. A driveway that holds water fails from underneath. It needs a crown or a cross-fall to shed water, and somewhere for it to go.

A contractor offering a 1.5 inch driveway over 4 inches of base at an attractive price is offering something that will rut and crack in five years. Ask for both numbers in writing.

Cracking in an asphalt surface
Fill cracks before sealing. Sealer is not a crack filler, and bridging a crack with sealer achieves nothing except hiding it for a season.

Sealcoating, without the folklore

Asphalt oxidizes in UV and the binder becomes brittle. Sealcoating replaces the surface film and slows that.

The honest version:

  • Wait a year after installation before the first seal. New asphalt needs to cure and sealing it too early traps oils and keeps it soft.
  • Every three to five years afterwards, not annually. Over-sealing builds a thick brittle layer that cracks on its own and looks worse than bare asphalt.
  • Fill cracks first. Sealer is not a crack filler and bridging a crack with sealer achieves nothing.
  • Beware the door-to-door offer. Driveway sealing sold by someone with leftover material from another job is a long-standing scam, and the material is frequently diluted.

Done on the right cycle it genuinely extends the life. Done annually it does not.

Frequently asked questions

How long before I can park on it?

Two to three days for cars, longer in hot weather. Avoid turning the wheels of a stationary car for the first few weeks, and keep motorcycle stands and trailer jacks off it, because point loads mark new asphalt.

Can new asphalt go over the old?

Over a sound base with no major cracking or settlement, yes: a 1.5 to 2 inch overlay for $3 to $7 a square foot. Over a failing base it repeats the failure within a few years.

Why is my driveway cracking in a pattern like crocodile skin?

Alligator cracking means the base has failed and the surface is flexing over it. It cannot be sealed or patched away; that area needs removing and rebuilding.

Does the season matter?

Yes. Asphalt needs to be laid warm, and most contractors will not pave below about 50°F. Late spring to early fall is the season, and the best prices are usually early in it.

Is a gravel driveway a reasonable option?

For a long rural drive, yes, at $2 to $6 a square foot. It needs regrading every year or two and topping up every few years, it is poor for snow clearing, and it is a third of the price.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$1,400 to $2,600

Typically $2,000 · 200 sq ft · standard · national

Built from this guide's national range of $7 to $13 per sq ft. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for paving, surfacing and tamping equipment operators in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 45% of this job is labor, so a state paying 20% above the national mean lands about 9% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per sq ft cost by state, most expensive first
StateTypicalRangeWage index
Hawaii$13$9.02 to $171.64×
California$13$8.89 to $171.60×
Washington$12$8.70 to $161.54×
Alaska$12$8.31 to $151.42×
District of Columbia$12$8.14 to $151.36×
Show the other 40 states
StateTypicalRangeWage index
Connecticut$11$7.97 to $151.31×
Illinois$11$7.97 to $151.31×
Idaho$11$7.91 to $151.29×
New York$11$7.71 to $141.23×
Minnesota$11$7.69 to $141.22×
Missouri$11$7.60 to $141.19×
Oregon$11$7.58 to $141.19×
Wisconsin$11$7.51 to $141.16×
Rhode Island$11$7.43 to $141.14×
Massachusetts$10$7.30 to $141.09×
Maryland$10$7.29 to $141.09×
New Hampshire$10$7.29 to $141.09×
Ohio$10$7.21 to $131.07×
South Dakota$10$7.13 to $131.04×
Maine$10$7.11 to $131.03×
Iowa$10$7.06 to $131.02×
Arizona$10$7.04 to $131.01×
Wyoming$10$7.01 to $131.00×
Montana$9.95$6.96 to $130.99×
Indiana$9.90$6.93 to $130.98×
Colorado$9.86$6.90 to $130.97×
Nevada$9.86$6.90 to $130.97×
Vermont$9.83$6.88 to $130.96×
Pennsylvania$9.80$6.86 to $130.95×
New Jersey$9.77$6.84 to $130.95×
West Virginia$9.71$6.79 to $130.94×
Michigan$9.68$6.78 to $130.93×
Utah$9.68$6.77 to $130.93×
Kansas$9.65$6.75 to $130.92×
Louisiana$9.55$6.69 to $120.90×
Delaware$9.43$6.60 to $120.87×
Nebraska$9.30$6.51 to $120.84×
Virginia$9.28$6.50 to $120.84×
North Carolina$9.25$6.48 to $120.83×
Texas$9.23$6.46 to $120.83×
Florida$9.20$6.44 to $120.82×
Oklahoma$9.16$6.41 to $120.81×
Kentucky$9.15$6.40 to $120.81×
New Mexico$9.14$6.40 to $120.81×
Georgia$9.13$6.39 to $120.81×

Least expensive

StateTypicalRangeWage index
South Carolina$9.11$6.38 to $120.80×
Tennessee$9.00$6.30 to $120.78×
Arkansas$8.86$6.20 to $120.75×
Alabama$8.81$6.17 to $110.73×
Mississippi$8.61$6.03 to $110.69×

49 of 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for special indexes: construction materials

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

244316388202120222023202420252026
WPUSI012011 is 10.1% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPUSI012011.

Sources and methodology

Labor
Paving, surfacing and tamping equipment operators (SOC 47-2071) — BLS OEWS, May 2025
Materials
Special indexes: construction materials (BLS PPI WPUSI012011, August 2026)
Split
About 45% of this figure is labor and 55% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.