Window well cost

A window well costs $300 to $1,500 installed, or $600 to $2,700 with drainage. It causes a disproportionate number of wet basements, because a well without a drain is a bucket against a basement window.

A metal grate over a drain

National average

$700

each

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

A window well costs $300 to $1,500 installed, typically around $700. Adding drainage takes it to $600 to $2,700. A terraced or stepped well for an egress window is $800 to $3,000.

It is a small item that causes a disproportionate number of wet basements, because a well without a drain is a bucket held against a basement window.

What it costs

ItemTypical cost
Galvanized steel well, supplied and fitted$300 to $800
Composite or polyethylene well$400 to $1,200
Decorative stone-faced well$600 to $2,000
Terraced or stepped egress well$800 to $3,000
Excavation for a new well$300 to $1,200
Drain to the footing drain$300 to $1,200
Drain to daylight$400 to $1,500
Gravel base$50 to $300
Clear polycarbonate cover$80 to $400
Steel grate cover$150 to $600
Egress-compliant cover with a release$200 to $800
Ladder or step for egress$100 to $400
Replacing a rusted well$400 to $1,200
Liner over an existing well$150 to $500

The drain is the whole point

A window well collects the water that runs down the wall and the surface water that reaches it. If there is nowhere for that water to go, it fills, and once it is above the window sill it comes in.

A correct well has:

  • A drain in the base, either connected to the footing drain or run to daylight
  • A gravel base, six to twelve inches deep, not soil
  • The top edge above the surrounding grade by a couple of inches, so surface water does not run in over the lip
  • The grade around it sloping away
  • A cover

The most common defect is a well with a soil base and no drain. It works until a storm saturates the ground, and then it does not.

The second most common is a drain that exists and is blocked with leaves and silt, because there was no cover. Clearing it is a bucket and an hour; not clearing it is a flooded basement.

Leaves blocking a drain
Leaves and grit silt up the drain, and a cover is what keeps it working. Clearing it is a bucket and an hour; not clearing it is a flooded basement.

Covers, and why they matter more than they look

Water. A cover keeps rain and snowmelt out, which is most of what a drain has to handle.

Debris. Leaves and grit silt up the drain. A cover is what keeps it working.

Safety. An uncovered well is a three to six foot drop, and children and pets fall in. So do animals, which then have to be got out or removed dead.

Egress rules. If the window is an egress window, the cover must be openable from inside the well without tools, keys or special knowledge. A screwed-down grate on an egress window fails inspection and defeats the point.

Clear polycarbonate covers let light in, which matters if the window is the basement's main daylight. Steel grates are stronger and let more debris through.

For an egress window

Egress wells have their own requirements:

Requirement
Minimum area9 sq ft
Minimum projection from the wall36 in
Minimum width36 in
Ladder or steps required if deeper than44 in
Ladder projection into the well3 in maximum
Cover openable from inside without toolsrequired

A standard well is typically too small and too shallow in projection for egress. If the window is being upgraded to egress, the well usually has to be replaced too, and that is part of why an egress window costs $3,000 to $8,000.

Frequently asked questions

My window well fills with water. What do I do?

Check whether there is a drain at all: dig down through the gravel in one corner. If there is one, it is probably blocked and can often be cleared or jetted. If there is none, adding one is $300 to $1,200 and it is the fix.

Can I just fill the well with gravel?

Gravel improves drainage within the well and it does not create an outlet. Water still has to go somewhere. Gravel plus a drain works; gravel alone delays the problem.

Are the decorative stone wells worth it?

They look considerably better than corrugated steel and they are structurally the same job. On a visible elevation the difference is worth the $300 to $1,000.

How deep should the gravel be?

Six to twelve inches below the window sill level, over the drain, so water reaching the base has somewhere to sit while it drains.

Do I need a permit?

For replacing a well, usually not. For a new egress window and well, yes, because the opening in the foundation is structural and the well dimensions are inspected.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$300 to $1,500

Typically $700 · 1 each · standard · national

Built from this guide's national range of $300 to $1,500 each. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for construction laborers in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 55% of this job is labor, so a state paying 20% above the national mean lands about 11% above the national price rather than 20%. Materials cost much the same everywhere.

Typical each cost by state, most expensive first
StateTypicalRangeWage index
Hawaii$844$362 to $1,8091.38×
Massachusetts$839$360 to $1,7981.36×
New Jersey$836$358 to $1,7911.35×
Illinois$815$349 to $1,7471.30×
California$795$341 to $1,7031.25×
Show the other 40 states and the District of Columbia
StateTypicalRangeWage index
Minnesota$794$340 to $1,7011.24×
New York$775$332 to $1,6611.20×
Rhode Island$772$331 to $1,6541.19×
Washington$769$329 to $1,6471.18×
Missouri$765$328 to $1,6401.17×
Alaska$754$323 to $1,6151.14×
Connecticut$753$323 to $1,6141.14×
Ohio$746$320 to $1,5991.12×
Wisconsin$744$319 to $1,5941.11×
Oregon$727$312 to $1,5581.07×
Pennsylvania$717$307 to $1,5361.04×
Indiana$715$306 to $1,5321.04×
Nevada$715$306 to $1,5321.04×
North Dakota$708$304 to $1,5171.02×
Michigan$708$303 to $1,5171.02×
District of Columbia$701$301 to $1,5031.00×
New Hampshire$698$299 to $1,4950.99×
Iowa$697$299 to $1,4930.99×
Montana$697$299 to $1,4930.99×
Vermont$692$297 to $1,4840.98×
Colorado$684$293 to $1,4650.96×
Idaho$675$289 to $1,4460.93×
Utah$673$288 to $1,4420.93×
Nebraska$673$288 to $1,4420.93×
Maryland$673$288 to $1,4410.93×
Delaware$670$287 to $1,4360.92×
Arizona$669$287 to $1,4340.92×
Maine$669$287 to $1,4330.92×
Tennessee$655$281 to $1,4040.88×
Kentucky$654$280 to $1,4020.88×
Kansas$652$279 to $1,3970.88×
West Virginia$652$279 to $1,3970.88×
South Carolina$651$279 to $1,3960.87×
Wyoming$651$279 to $1,3950.87×
North Carolina$650$279 to $1,3930.87×
Florida$645$276 to $1,3810.86×
South Dakota$643$275 to $1,3770.85×
Virginia$638$273 to $1,3670.84×
Oklahoma$635$272 to $1,3620.83×
Texas$632$271 to $1,3550.82×
Louisiana$628$269 to $1,3450.81×

Least expensive

StateTypicalRangeWage index
Georgia$622$267 to $1,3330.80×
New Mexico$622$266 to $1,3320.80×
Mississippi$613$263 to $1,3140.78×
Arkansas$605$259 to $1,2970.75×
Alabama$596$255 to $1,2760.73×

All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for concrete products

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

268345422202120222023202420252026
WPU133 is 4.2% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU133.

Sources and methodology

Labor
Construction laborers (SOC 47-2061) — BLS OEWS, May 2025
Materials
Concrete products (BLS PPI WPU133, August 2026)
Split
About 55% of this figure is labor and 45% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.
Also