Mudjacking cost

Mudjacking a settled slab costs $500 to $2,000 per area. It works when the concrete is intact and the ground under it has washed out. It does not work when the slab is broken.

A cracked and uneven concrete path

National average

$1,200

each

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Mudjacking a settled concrete slab costs $500 to $2,000 per area, typically around $1,200. Polyurethane foam lifting costs $800 to $2,500 for the same job. Replacing the slab costs $8 to $20 a square foot, which is usually three to five times either.

It works when the concrete is intact and the ground under it has washed out or compacted. It does not work when the slab is broken.

What it costs

JobTypical cost
Mudjacking, per area or slab section$500 to $2,000
Mudjacking, per square foot$3 to $8
Polyurethane foam lifting, per square foot$5 to $15
Driveway section$600 to $2,500
Garage floor$800 to $3,000
Patio$500 to $2,000
Sidewalk, per section$150 to $500
Steps$300 to $1,200
Pool deck$1,000 to $4,000
Basement floor$1,000 to $4,000
Sealing the drilled holesincluded
Replacing the slab instead, per square foot$8 to $20
A hole being drilled in concrete
Holes an inch or two across, slurry or expanding foam pumped underneath, the slab lifted back to level, the holes patched. A few hours, and usable the same day with foam.

How it works

Holes about an inch or two across are drilled through the slab. A slurry or an expanding foam is pumped underneath. The material fills the void, then lifts the slab back to level. The holes are patched.

It takes a few hours and the slab is usable the same day with foam, or within 24 to 48 hours with mudjacking.

Mudjacking uses a cement and soil slurry. Cheaper, heavier, larger holes, and the material can itself compress over decades. Well proven and it has been done for seventy years.

Polyurethane foam uses a two-part expanding foam. Lighter, so it adds almost no load to the soil that failed in the first place, smaller holes, waterproof, and cures in minutes. Costs more and is the better product on poor soil.

Foam is generally the better choice on anything where the soil is questionable, which is most of the situations that caused the settlement.

When it works and when it does not

It works when the slab is structurally sound, the settlement is from a void or compaction under it, and there is somewhere to lift it back to.

It does not work when:

  • The slab is cracked into several pieces that will not move together
  • The concrete is spalling and crumbling
  • The cause is still active, such as a leaking pipe washing soil out
  • The slab is a structural element carrying a load it was never designed for
  • The soil beneath is expansive clay that will move again next season

That third point matters most. Lifting a slab over a leaking water line is a repair with a schedule attached. Find out why the soil went before paying to fill the space it left.

Slab lifting or replacement

LiftingReplacement
Cost$500 to $2,500$8 to $20 per sq ft
TimeHoursDays, plus curing
UsableSame day to 48 hours7 days, 28 for vehicles
AppearanceExisting slab with patched holesNew, uniform
CracksRemainGone
Works if slab is brokenNoYes
Addresses the causeNoNo

Lift when the slab is sound and you want the trip hazard and the drainage fixed. Replace when the concrete itself has failed, or when you were going to replace it in a few years anyway.

Frequently asked questions

How long does it last?

Foam lifting is generally permanent as long as the underlying cause is resolved. Mudjacking can settle again over ten to twenty years because the slurry is heavy and compresses. Both fail early if the water that caused it is still running.

Will the cracks disappear?

No. Lifting raises the slab; it does not repair the concrete. Existing cracks can be filled afterwards and will still be visible.

Can it lift a house foundation?

Foam is used for some slab-on-grade foundation work, and that is engineering rather than a driveway repair. Settling house foundations are usually piered rather than lifted. Get an engineer.

Is it worth it on a badly cracked driveway?

No. If the slab is in pieces, lifting moves the pieces separately and the result is worse. That is a replacement.

What causes the void in the first place?

Water. Poor drainage washing soil out, a downspout discharging at the edge, a leaking pipe, or fill that was never properly compacted when the slab was poured. Fix that first or you are buying the repair twice.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$500 to $2,500

Typically $1,200 · 1 each · standard · national

Built from this guide's national range of $500 to $2,500 each. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for cement masons and concrete finishers in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 80% of this job is labor, so a state paying 20% above the national mean lands about 16% above the national price rather than 20%. Materials cost much the same everywhere.

Typical each cost by state, most expensive first
StateTypicalRangeWage index
Alaska$1,839$766 to $3,8311.67×
Hawaii$1,606$669 to $3,3471.42×
Washington$1,549$645 to $3,2271.36×
Illinois$1,484$618 to $3,0911.29×
Massachusetts$1,403$584 to $2,9221.21×
Show the other 40 states and the District of Columbia
StateTypicalRangeWage index
New York$1,401$584 to $2,9191.21×
California$1,374$572 to $2,8621.18×
Minnesota$1,371$571 to $2,8551.18×
Oregon$1,363$568 to $2,8401.17×
Wisconsin$1,340$558 to $2,7921.15×
New Jersey$1,337$557 to $2,7861.14×
Rhode Island$1,295$540 to $2,6991.10×
District of Columbia$1,268$528 to $2,6411.07×
Missouri$1,266$527 to $2,6361.07×
Nevada$1,266$527 to $2,6361.07×
Ohio$1,260$525 to $2,6251.06×
Vermont$1,240$517 to $2,5841.04×
Montana$1,234$514 to $2,5701.03×
Pennsylvania$1,232$513 to $2,5661.03×
Connecticut$1,217$507 to $2,5351.02×
Delaware$1,210$504 to $2,5211.01×
Indiana$1,205$502 to $2,5101.00×
Colorado$1,205$502 to $2,5101.00×
Arizona$1,192$497 to $2,4830.99×
Wyoming$1,192$497 to $2,4830.99×
Michigan$1,178$491 to $2,4540.98×
New Hampshire$1,176$490 to $2,4510.97×
Iowa$1,164$485 to $2,4260.96×
Maine$1,155$481 to $2,4060.95×
Kansas$1,148$479 to $2,3930.95×
North Dakota$1,148$478 to $2,3920.95×
Idaho$1,133$472 to $2,3610.93×
Utah$1,127$470 to $2,3480.92×
Maryland$1,109$462 to $2,3100.91×
South Carolina$1,106$461 to $2,3030.90×
Virginia$1,086$452 to $2,2620.88×
Louisiana$1,085$452 to $2,2600.88×
New Mexico$1,085$452 to $2,2600.88×
Florida$1,080$450 to $2,2500.88×
Kentucky$1,079$449 to $2,2470.87×
Nebraska$1,077$449 to $2,2440.87×
West Virginia$1,049$437 to $2,1850.84×
Texas$1,028$428 to $2,1410.82×
Georgia$1,027$428 to $2,1400.82×
South Dakota$1,020$425 to $2,1250.81×
Tennessee$1,018$424 to $2,1220.81×

Least expensive

StateTypicalRangeWage index
North Carolina$995$415 to $2,0730.79×
Oklahoma$976$407 to $2,0330.77×
Arkansas$971$404 to $2,0220.76×
Alabama$969$404 to $2,0190.76×
Mississippi$935$390 to $1,9480.72×

All 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for ready-mix concrete

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

233327420202120222023202420252026
WPU1332 is 1.2% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU1332.

Sources and methodology

Labor
Cement masons and concrete finishers (SOC 47-2051) — BLS OEWS, May 2025
Materials
Ready-mix concrete (BLS PPI WPU1332, August 2026)
Split
About 80% of this figure is labor and 20% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.