Brick veneer cost

Brick veneer costs $12 to $30 a square foot installed. Among the most expensive claddings to install and the cheapest to own, because it needs essentially nothing for a century.

A brick house exterior

National average

$18

per sq ft

National estimate as of September 2026, not a quote. Where these figures come from.

Base pricing reviewed September 2026

Brick veneer costs $12 to $30 a square foot installed, typically around $18. On a 2,000 square foot house with 2,200 square feet of wall, that is $26,400 to $66,000. It is among the most expensive claddings to install and among the cheapest to own, because it needs essentially nothing for a century.

Veneer is a single wythe of brick standing on a ledge, tied back to the wall, with an air gap behind it. It is not structural. Everything about how it performs depends on what happens in that air gap.

What it costs

OptionInstalled, per square foot
Standard brick veneer$12 to $25
Premium or specialty brick$20 to $35
Thin brick over existing wall$8 to $18
Manufactured stone veneer$12 to $28
Natural stone veneer$25 to $50
Brick accent on one elevation$2,500 to $12,000
ExtraTypical cost
Brick ledge or steel angle support$2,000 to $8,000
Removing existing siding$1 to $4 per sq ft
Weather-resistive barrier$0.50 to $1.50 per sq ft
Flashing and weep holesincluded, ask specifically
Lintels over openings$150 to $600 each
Repointing existing brick$8 to $20 per sq ft
Brick cleaning and sealing$1 to $4 per sq ft
Painting or limewashing brick$2 to $6 per sq ft

The retrofit problem

Adding brick veneer to a house that was not built for it is the expensive case, and it is worth understanding why before getting a quote.

Brick is heavy: roughly 40 pounds per square foot. It has to stand on something. In new construction that is a brick ledge cast into the foundation. On an existing house with no ledge, the options are pouring a new footing and ledge, or hanging a steel shelf angle bolted to the structure. Both are structural work, both need engineering, and both are why a retrofit brick job starts several thousand dollars above the per-square-foot number.

Thin brick avoids this entirely. It is a half-inch to one-inch slice of real brick applied like tile over a prepared wall, and it weighs a tenth as much. It costs $8 to $18 a square foot, needs no ledge, and looks correct except at window returns and corners, where the shallow depth shows. Corner units help.

For a retrofit on an existing house, thin brick is usually the right answer and full veneer is usually the wrong one.

Mortar joints in brickwork
Weep holes at the base of every wall look like missing mortar and are meant to. Anyone who fills them has broken the drainage system.

The air gap is the system

Brick is not waterproof. It absorbs water in a driving rain and releases it afterwards. That is normal and it is why there must be a one-inch minimum air space behind it, with a drainage path out.

Three things make it work:

Weep holes at the base of every wall and above every opening, roughly every 24 inches, left open. They look like missing mortar and they are meant to. Anyone who fills them, or a landscaper who buries the bottom course, has broken the system.

Flashing at the base of the cavity and above every window and door, turned up behind the barrier and out through the face.

Ties to the structure at the correct spacing, which is what stops a non-structural wall falling over.

If you look at a brick house and cannot find any weep holes, the cavity has nowhere to drain.

Manufactured stone, honestly

Manufactured stone veneer is colored concrete cast in molds. It costs a third of natural stone, weighs a third as much, and installs like thin brick.

It looks convincing from ten feet and less convincing up close, particularly at corners and where the color repeats across the same mold. It is also the material behind a large share of moisture-intrusion claims in the last two decades, almost always because it was installed directly over sheathing with no drainage plane and no weep screed.

It is a reasonable product installed correctly and a reliable disaster installed wrong, which makes the installer the whole decision.

Frequently asked questions

How long does brick veneer last?

A hundred years or more. The mortar joints need repointing at fifty to eighty years, at $8 to $20 a square foot. Nothing else about it wears out.

Does brick insulate?

Barely, about R-0.8 for the brick itself. The air gap adds a little. If you want insulation from a re-clad, it goes in the cavity or as rigid foam on the sheathing, not in the brick.

Can I paint brick?

Yes, with a breathable mineral or masonry paint, and it is close to irreversible. Limewashing is the gentler, semi-transparent version and can be partly removed early on. Both need recoating every eight to fifteen years, which converts a zero-maintenance cladding into a maintained one.

Why is my brick spalling?

The face is flaking off, usually because water is getting in and freezing, or because someone repointed with a mortar harder than the brick, or sealed it with something impermeable. Sealing brick is almost always a mistake for this reason.

Is brick worth it for resale?

It reads as permanent and it photographs well, and appraisers in most markets treat a brick house favorably. It is not a return-on-investment calculation so much as a category the house sits in.

Price this for your job

The same range applied to your measurements and your state, so the number you take into a quote is the one for the job you are having done.

What most quotes describe: mid-range materials, ordinary conditions.

Moves the labor part only. Materials cost much the same everywhere.

$2,400 to $6,000

Typically $3,600 · 200 sq ft · standard · national

Built from this guide's national range of $12 to $30 per sq ft. An estimate for reading a quote, not a quote.

What this costs in your state

Priced from the mean hourly wage for brickmasons and blockmasons in each state against the national mean, BLS OEWS May 2025. Only the labor part of the figure moves: about 55% of this job is labor, so a state paying 20% above the national mean lands about 11% above the national price rather than 20%. Materials cost much the same everywhere.

Typical per sq ft cost by state, most expensive first
StateTypicalRangeWage index
Massachusetts$23$15 to $381.46×
Minnesota$21$14 to $361.34×
New York$21$14 to $351.33×
Washington$20$14 to $341.25×
Illinois$20$14 to $341.24×
Show the other 39 states and the District of Columbia
StateTypicalRangeWage index
New Jersey$20$13 to $341.22×
Oregon$20$13 to $331.20×
Rhode Island$20$13 to $331.20×
Wisconsin$19$13 to $321.14×
Hawaii$19$13 to $321.12×
District of Columbia$19$13 to $321.10×
Pennsylvania$19$13 to $311.08×
California$19$12 to $311.07×
North Dakota$18$12 to $311.05×
Connecticut$18$12 to $311.05×
Delaware$18$12 to $301.02×
Ohio$18$12 to $301.02×
Indiana$18$12 to $301.00×
Missouri$18$12 to $301.00×
Michigan$18$12 to $300.99×
New Hampshire$18$12 to $300.97×
Iowa$18$12 to $290.96×
Idaho$17$12 to $290.94×
Colorado$17$12 to $290.94×
Wyoming$17$12 to $290.93×
Tennessee$17$12 to $290.93×
Kansas$17$11 to $280.90×
Vermont$17$11 to $280.90×
South Dakota$17$11 to $280.89×
Arizona$17$11 to $280.89×
Utah$17$11 to $280.88×
Nebraska$17$11 to $280.87×
Nevada$17$11 to $280.87×
Kentucky$17$11 to $280.85×
Maryland$16$11 to $270.83×
Montana$16$11 to $270.81×
Florida$16$11 to $270.81×
Louisiana$16$11 to $270.81×
Virginia$16$11 to $270.80×
Georgia$16$11 to $270.79×
Oklahoma$16$11 to $270.79×
Texas$16$11 to $270.79×
South Carolina$16$11 to $260.78×
Arkansas$16$10 to $260.77×
Maine$15$10 to $260.75×

Least expensive

StateTypicalRangeWage index
Alabama$15$10 to $260.74×
North Carolina$15$10 to $260.74×
West Virginia$15$10 to $250.73×
Mississippi$15$10 to $250.71×
New Mexico$15$9.99 to $250.69×

49 of 50 states and the District of Columbia. BLS suppresses an estimate where the sample is too small to publish, and those are left out rather than filled in with the national figure.

Producer price index for concrete products

This is a materials cost trend, not a project price. It is what producers charge for the material, indexed to a base year — useful for seeing which way the material behind this job has moved, and not a figure to multiply anything by.

268345422202120222023202420252026
WPU133 is 4.2% higher than twelve months ago, which moves the materials part of this job and not the labor. Source: BLS series WPU133.

Sources and methodology

Labor
Brickmasons and blockmasons (SOC 47-2021) — BLS OEWS, May 2025
Materials
Concrete products (BLS PPI WPU133, August 2026)
Split
About 55% of this figure is labor and 45% materials, which is what decides whether it moves with wages or with the commodity index. How we calculate costs.